Projects

Power experience behind our AI infrastructure work

Our project record is in energy and grid infrastructure. It is the foundation for how we approach large loads and AI data centres: power first, grid second, everything else built around them.

FOUNDATION

Power & renewable experience

Solar, wind, storage and generation projects.

CAPABILITY

Grid & energy infrastructure

Interconnection, system studies, utility coordination.

APPLICATION

Large-load infrastructure

Load modelling and large-load interconnection.

FOCUS

AI & data centres

Power-ready infrastructure for AI and HPC.

Energy & grid projects

Selected Canadian projects where Greenfinity has provided interconnection, permitting, technical advisory and development support.

Hybrid solar + storage
Ontario

Tilbury Renewable Energy Centre

Developer: Capstone Infrastructure

TypeHybrid solar + storage
Capacity80 MW solar / 320 MWh storage
StatusIESO "Application Under Review" (March 2025)

Our role: Greenfinity Energy provides interconnection modelling and development coordination services for Capstone Infrastructure's hybrid facility, supporting grid resiliency and renewable integration in Ontario.

Battery energy storage
Ontario

Hagersville BESS

Developer: Potentia Renewables Inc.

TypeBattery energy storage
Capacity300 MW / 1,200 MWh
StatusIESO "Application Complete" (April 2024)

Our role: Greenfinity Energy provides technical support and permitting assistance for this large-scale storage facility, which plays a key role in Ontario's long-term energy storage goals.

Wind energy
Alberta

Oyen Wind Power Project

TypeWind energy
Capacity~200 MW
StatusAESO Abbreviated Needs Approval issued (Nov 28, 2024)

Our role: As part of the project team, Greenfinity Energy supports grid interconnection analysis and stakeholder coordination to move the project from regulatory approval to implementation.

Natural gas-fired generation
Alberta

Little Flipi Gas Generation Project Connection

Location: Red Deer area

TypeNatural gas-fired generation
Capacity~100 MW
StatusAESO Need Identification Document filed (May 22, 2025)

Our role: Greenfinity Energy provides technical advisory services with the lead developer, supporting transmission planning and regulatory filings, including interconnection analysis and compliance review.

Solar PV
Ontario

Altavista Solar Facility

100,000+ high-efficiency panels

TypeSolar PV
Capacity50 MW · ~80,000 MWh/yr
StatusCommercial operation (2022)

Our role: Greenfinity Energy contributed engineering and permitting expertise as part of a larger consortium that developed this high-efficiency solar facility.

Project FAQs

What role did Greenfinity play on each project?

Our role varies by project, from interconnection modelling and development coordination to permitting support and technical advisory. The role on each project is described above.

How does this experience apply to AI data centres?

Large AI loads face the same constraint as generation projects: grid capacity. The interconnection studies, utility coordination and system modelling we do for generation projects are the same disciplines needed to bring large loads online.

Which system operators do you work with?

Our project experience includes the Alberta Electric System Operator (AESO) and Ontario's Independent Electricity System Operator (IESO), and we support projects in British Columbia.

Do you support battery storage and hybrid projects?

Yes. Our portfolio includes standalone battery storage (Hagersville BESS) and hybrid solar-plus-storage (Tilbury Renewable Energy Centre).

Have a project in development?

Tell us about your site and timeline. We'll tell you where the risks are.

Start a Conversation →