Powering the next generation of AI infrastructure.
Greenfinity develops and sources power-ready infrastructure for AI, HPC and data centre deployment across Canada and North America.
From power and site identification to grid interconnection, infrastructure development and deployment, we bring energy, real estate and technical expertise together to accelerate AI capacity.
12+ years of power systems expertise
Grid planning, stability studies, interconnection and HVDC protection design.
700+ MW of power projects supported
Solar, wind, battery storage and generation projects in Alberta and Ontario.
Power, site, grid and delivery
One team from power and site identification through development and construction.
AI infrastructure starts with power.
We start with the grid.
Power availability determines what can be built, where it can be built and how quickly it can come online. Our foundation in power systems lets us work the problem in the right order.
Power
Utility capacity, behind-the-meter and on-site generation.
Power-ready sites
Powered land, powered shells, existing facilities and industrial conversions.
Data centre infrastructure
Electrical distribution, cooling, modular and colocation capacity.
AI / HPC deployment
High-density compute brought online on a realistic power schedule.
Four capabilities, one development platform
AI & data centre infrastructure
Infrastructure for high-density compute, coordinated and integrated with the power and site behind it.
- AI / HPC data centres
- High-density GPU infrastructure
- Liquid cooling
- Modular data centres
- Colocation
- Powered shells
- Industrial conversion
Power & site sourcing
Identifying sites where MW-scale power is available now, or can realistically be delivered.
- Powered land
- Existing data centre capacity
- Industrial properties
- Utility power
- Behind-the-meter generation
- CHP / on-site generation
- Large-load site screening
Grid & energy infrastructure
The power systems expertise behind our track record in renewable and generation projects.
- Grid interconnection
- Utility coordination
- Power system studies
- PSS/E
- PSCAD
- WECC / AESO / IESO
- Substation / transmission
- Solar
- Wind
- Battery energy storage
Development & delivery
Carrying projects from feasibility through construction and commissioning.
- Feasibility
- Site due diligence
- Permitting
- Utility coordination
- Design coordination
- Procurement
- Construction
- Commissioning

The grid is the bottleneck for AI.
AI and HPC loads are arriving faster than grid capacity is being built.
Interconnection queues are longer, load studies are more demanding and network upgrade costs can change a project's economics overnight. A site that looks ideal on paper may sit behind a congested line.
Our team has spent more than a decade on power system planning, interconnection studies and utility coordination for generation and storage projects. We apply the same discipline to large loads: where capacity exists, what upgrades are likely, and when power can realistically be delivered.
Explore Our ServicesWe are sourcing power-ready capacity
Greenfinity is actively sourcing power-ready infrastructure for AI and HPC deployment across Canada and selected North American markets.
Existing data centres, colocation and powered shells that can be energized soon.
Powered land, industrial conversions and sites with confirmed utility capacity.
Utility-supplied or behind-the-meter sites suitable for large-scale AI campuses.
Proven on power and renewable projects
Our foundation is in energy: interconnection modelling, permitting support and technical advisory on solar, wind, battery storage and generation projects, including Tilbury Renewable Energy Centre and Hagersville BESS in Ontario, and Oyen Wind and Little Flipi in Alberta.
That experience is what we bring to AI and data centre infrastructure.
See Our Projects
Common questions
What does Greenfinity do?
We are an energy and AI infrastructure development company. We identify power and sites, assess grid and interconnection, and coordinate development and delivery for AI, HPC and data centre capacity, building on our background in power systems and renewable energy projects.
Does Greenfinity own or operate data centres?
No. We are a development platform: we source and develop power-ready infrastructure and coordinate the partners needed to deliver it. We are not a data centre or colocation operator, a utility or an equipment manufacturer.
What kind of sites or capacity are you looking for?
Existing data centres and colocation capacity, powered shells, powered land, industrial conversion opportunities, utility-supplied sites and behind-the-meter generation, from roughly 1 MW to 50 MW and above. See our Current Requirements page.
Do you still work on renewable energy projects?
Yes. Grid interconnection, power system studies and development support for solar, wind and battery storage remain core services.
Do you sign NDAs before reviewing site or project information?
Yes. We are happy to sign a mutual NDA before you share site, financial or technical details.
Have power, a site or available capacity?
We are actively sourcing power-ready infrastructure for AI and HPC deployment. Tell us what you have.